Home/CONSTRUCTION PROGRESS REPORTS
CONSTRUCTION VIDEO DIARY • EL ORDO GROUP

CONSTRUCTION PROGRESS REPORTS

Chronological 4K updates and on-site diary from groundbreak to handover across all developments since 2021.

6Projects in Portfolio
120+Builders on Shift
M350 / M450Seismic Safety (9 Points)
100%Lab Strength Certified
ЖК Abu Dhabi
September 28, 2026Under Construction
Craftsmen on Shift:52 pers.
Tower Cranes Active:2 units
Construction Pace:+2.5 floors / mo.

ЖК Abu Dhabi

Project Details

8th floor slab pour (Block B)

Overall Completion:42%
Milestone Progress Breakdown:
Concrete Core55%
Brick Masonry25%
Façade Insulation10%
MEP Engineering15%

Active construction at Abu Dhabi residential complex: continuous concrete pouring of the 8th-floor slab in Block B successfully completed with high-strength seismic-grade compliance.

Accomplished during the current cycle:
Poured ~400 m³ of grade M450 high-strength certified concrete
Successfully completed 8th-floor slab pouring in Block B
Strict vibration compaction and curing control protocols applied
Video Archive Since Groundbreak6 video reports
ЖК Madina Residence
August 17, 2026Under Construction
Craftsmen on Shift:48 pers.
Tower Cranes Active:1 units
Construction Pace:On track (facade 70%)

ЖК Madina Residence

Project Details

Façade works 70% & MEP

Overall Completion:78%
Milestone Progress Breakdown:
Concrete Core100%
Ventilated Façade70%
Window Glazing85%
MEP Engineering60%

At Madina Residence business-class development (Chuy Ave & 7 April St), facade installation across all three blocks reached 70%. Block A interior lighting is 100% completed, Block B plumbing reached 50%, and roof timber structures are undergoing protective treatment.

Accomplished during the current cycle:
Exterior facade works across all 3 blocks completed at 70%
Block A: electrical network and internal lighting 100% completed
Block B: plumbing and sanitary pipeline installation reached 50%
Video Archive Since Groundbreak4 video reports
ЖД Айкол +
September 26, 2026Under Construction
Craftsmen on Shift:32 pers.
Tower Cranes Active:1 units
Construction Pace:+2 floors / mo.

ЖД Айкол +

Project Details

7th floor slab pouring

Overall Completion:62%
Milestone Progress Breakdown:
Concrete Core78%
Brick Masonry55%
Roofing20%
MEP Engineering25%

Continuous 4-hour concrete pour completed for the 7th-floor slab at Aykol+ boutique residence. High-grade M350 concrete applied under strict seismic building standards.

Accomplished during the current cycle:
Poured 180 m³ of grade M350 high-durability certified concrete
Completed 7th-floor slab pour (continuous 4+ hours pump operation)
Mechanical vibration compaction & laboratory sample verification passed
Video Archive Since Groundbreak3 video reports
ЖД Айкол
Commissioned & OccupiedCommissioned & Occupied
Craftsmen on Shift:-
Tower Cranes Active:-
Construction Pace:Keys Handed Over (11.09.2026)

ЖД Айкол

Project Details

ОБЪЕКТ СДАН В ЭКСПЛУАТАЦИЮ

Overall Completion:100%
Milestone Progress Breakdown:
Concrete Core100%
Brick Walls100%
Façade & Windows100%
Utilities & MEP100%

Aykol residential building is officially commissioned and delivered! On September 11, 2026, a grand key handover celebration took place with live performances, giveaways, and prize raffles. The building is 100% complete and fully connected to all municipal utilities.

Accomplished during the current cycle:
Ceremonial key handover & prize giveaways to new residents (Sept 11, 2026)
100% construction completion and official commissioning status
Building fully integrated into central municipal utility networks
Visit Complex Page
ЖК Келечек
Commissioned & OccupiedCommissioned & Occupied
Craftsmen on Shift:-
Tower Cranes Active:-
Construction Pace:100% Delivered

ЖК Келечек

Project Details

ОБЪЕКТ СДАН В ЭКСПЛУАТАЦИЮ

Overall Completion:100%
Milestone Progress Breakdown:
Concrete Core100%
Brick Masonry100%
MEP Engineering100%
Courtyard & Playgrounds100%

Successfully completed, commissioned, and resident-occupied complex by EL ORDO GROUP.

Accomplished during the current cycle:
100% completion & positive State Commission acceptance
Official state property titles issued to owners
Private gated courtyard in full operation
Visit Complex Page
КД Ордо
Commissioned & OccupiedCommissioned & Occupied
Craftsmen on Shift:-
Tower Cranes Active:-
Construction Pace:100% Delivered

КД Ордо

Project Details

ОБЪЕКТ СДАН В ЭКСПЛУАТАЦИЮ

Overall Completion:100%
Milestone Progress Breakdown:
Concrete Core100%
Natural Stone Façade100%
Gas Heating Plant100%
Basement Parking100%

The hallmark boutique club house completed by EL ORDO GROUP (2021-2023 construction period).

Accomplished during the current cycle:
100% delivered, commissioned, and fully occupied
Exterior cladded with premium granite and travertine
Autonomous boiler station and 24/7 security patrol active
Video Archive Since Groundbreak3 video reports
Visit Complex Page